×

Click for
Table of Contents

menuEP-54V-150W Quick Start Guide

Package Contents

EdgePower™ EP-54V-150W
Mount Brackets (Qty. 4)
Bracket Screws (M4x5.3, Qty. 16)
Rack-Mount Screws (#10-32 x 5/8", Qty. 4)
Cage Nuts (#10-32 x 5/8", Qty. 4)
Mounting Screws (M4x30, Qty. 8)
Screw Anchors (M4x24, Qty. 8)
Power Cord

System Requirements

Installation Requirements

Optional Power Supply Modules

A secondary PSU module bay is available for reserving a hot-swappable, backup PSU or for increasing the DC output power to 300W. Two PSU models are available:

AC/DC 54V, 150W PSU Model EP-54V-150W-AC DC/DC 54V, 150W PSU Model EP-54V-150W-DC

Hardware Overview

Management Port

10/100 Ethernet port for accessing the EdgePower Configuration Interface.

PSU 1

Primary PSU module bay supports a 150W PSU module. Factory default is On, and is configurable through the EdgePower Configuration Interface.

PSU 2

Secondary PSU module bay supports an optional 150W PSU module for increasing power output, or configured Off to house a spare PSU module. Factory default is On, and is configurable through the EdgePower Configuration Interface.

DC Out

Connect the DC cable to this terminal block. Supports up to 300W output.

Power LED

Green

System On

Ethernet LED

Off

No Link

Green

Link Established at 10/100 Mbps

PSU LED

Off

PSU 1 and PSU 2 Off

Amber

PSU 1 or PSU 2 On and Working Properly

Green

PSU 1 and PSU 2 On and Working Properly

Reset Button

To restore to factory defaults, press and hold the Reset button for more than five seconds.

PSU Module LED

Off

Inactive, Power Off

Green

Active, Power On

PSU Module

Preinstalled 54V, 150W AC/DC PSU module, model EP-54V-150W-AC.

Bay Cover

Keep the Bay Cover on when the bay is not occupied by a PSU module.

Grounding Bolt

Auxiliary grounding point for grounding the EdgePower.

Hardware Installation

Rack Mounting

  1.  
  2. OR

Wall Mounting

Shelf Mounting

Connecting the EdgePower

  1.  
  2. EdgePoint (EP-R8 or EP-S16) or other 54VDC device

    Optional

    Note: Connecting to the Management Port is only necessary for accessing the configuration interface to configure PSU 2 or to monitor power.

Installing a Ground Wire

We recommend installing a ground wire for added ESD protection and as a safety precaution.

Note: For guidelines about grounding and lightning protection, follow your local electrical regulatory codes.

Installing a Secondary PSU Module (Optional)

Accessing the Configuration Interface (Optional)

Access the EdgePower Configuration Interface to monitor status and power consumption, or to configure the PSU modules and network settings.

Configuration is only necessary if you have an optional PSU module installed in the PSU 2 bay and need to deactivate it. By default, PSU 2 is on and configured to provide additional power output.

Note: The EdgePower is set to DHCP by default with a fallback IP address of 192.168.1.20.

  1. Connect an Ethernet cable from your host system to the Management Port.
  2. Configure the Ethernet adapter on your host system with a static IP address on the 192.168.1.x subnet.
  3. Launch your web browser. Type https://192.168.1.20 in the address field. Press enter (PC) or return (Mac).

  4. Enter ubnt in the Username and Password fields. Click Login.
  5. To change the PSU module priority, select the appropriate PSU Priority on the Power screen, and click Save Changes.
  6. The PSU LED will light amber and the LED on PSU 2 will turn off, indicating that only PSU 1 is on and operational. Total power output is up to 150W.

Specifications

EP-54V-150W

Dimensions without Mount Brackets

299.8 x 286.9 x 42.55 mm
(11.89 x 11.3 x 1.675")

Weight without Mount Brackets

2.7 kg (5.95 lb)

Power Method

100-240VAC/50-60 Hz, Universal Input

Power Supply Module

54V, 150W AC/DC,
Model EP-54V-150W-AC,
Installed in PSU 1

Maximum Power Output

150W (1 PSU Module)
300W (2 PSU Modules @ 150W Each)

LEDs

Power System On/Off
Ethernet Management Port Link
PSU PSU1+PSU2, PSU1/PSU2

Networking Interface

(1) 10/100 RJ45 Ethernet

Management Interface

Ethernet In-Band, Web UI

Rack-Mount

Yes, 1U High

Operating Temperature

0 to 40° C (32 to 104° F)

Operating Humidity

10 to 90% RH

ESD/EMP Protection

Air ± 24KV; Contact ± 24KV

Certifications

CE, FCC, IC